Alternate Solution 1
My first alternate solution for the site layout was to leave everything alone. The only thing that would be added is the promenade. All uneven land would be filled, and plants would be dug up and replaced with newer ones. The chapel would remain in the same place, and the parking lot will be repaved, but not replaced or have its shape changed.
Alternate Solution 2
My second alternate solution added the promenade. All uneven land would be filled, and plants would be replaced. The chapel would remain in the same position. Two covered picnic areas would be located in the field next to the chapel. They would each be twenty feet by forty feet and have a concrete floor and covered top. Picnic tables would be placed underneath.
Alternate Solution 3
My third alternate solution filled all uneven land and added the promenade. Plants would be removed and replaced. The chapel remained in the same area. Additional parking was added in a plot in front of the chapel that was eighty feet by sixty feet. A picnic area would be built in the field next to the chapel that was eighty feet by forty feet. The area would be covered and have a cement floor. Picnic tables would be placed underneath for people to enjoy themselves at.
Alternate Solution 4
My final alternate solution replanted plants and constructed the promenade. All uneven land would be surveyed and filled. A picnic area twenty feet by sixty feet would be located towards the back of the chapel. It would have no covering and just picnic tables. Also, a gazebo would be placed next to the picnic area, with a circumference of about twenty-five feet. Parking and the chapel would remain the same.




No comments:
Post a Comment