Friday, December 23, 2011

Log 12

ED
Log Date: December 23, 2011
Marking Period 2
Green Pier

Work Started
  • Final touches on the final drawing.
Work Completed
  • Contacted mentors with several questions about the landscaping and gravel
  • Had a successful holday party :)
Reminders
  • Update mentors and keep constant with group members.
  • Ask teachers if help is needed.
  • Finish up drawings ASAP so midterm can be started.

Tuesday, December 20, 2011

Log 11

ED
Log Date: December 20, 2011
Marking Period 2
Green Pier

Work Started
  • Final steps of construction-Finishing up schedules of fill and gravel
Work Completed
  • My CAD drawing is now completely finished. Everything is included-dimensions, elevations, and all components.
  • Schedule of land fill is finished. I calculated that we will need 69, 985 cubed feet of fill to level the land by the coast. For purchasing purposes, we would round this to 70, 000 to account for erosion since we surveyed and any mistakes we could have made.
Reminders
  • Follow rubrics.
  • Stay on schedule.
  • Consult mentors and other group members before making any major changes.
  • Midterm needs to be started-it is very lengthy and its due date is approaching.

Monday, December 19, 2011

Topography Lines 3D

Elevation lines of the existing site-lightest is highest to darkest is lowest

Elevations lines with elevations with respect to sea level (measured in feet)

Friday, December 16, 2011

Log 10

ED
Log Date: December 16, 2011
Marking Period 2
Green Pier

Work Started
  • Began drawing different existing elevations of the site plan.  I started drawing them one way, but Ms. Green told me an easier way, so I started over. I am currently working on this, which is one of the last steps to finish my construction.
Reminders
  • Do work according to the rubrics.
  • Stay in time with the calendar.
  • Consult group members and mentors before making any major changes.
  • Remember that mentor contacts will be due in a few weeks.

Wednesday, December 14, 2011

Topography Lines

Existing Topography Lines, with measurements

New/Final Topography lines, with measurements. The final design will be slightly elevated closer to the coast to prevent runoff from going right into the water. The land will have a slight slope.

Tuesday, December 13, 2011

Log 9

ED
Log Date: December 13, 2011
Marking Period 2
Green Pier

Work Started
  • Topography Lines-Drawing the existing elevation lines on my 3D drawing. This will help me calculate the volume of fill I will need to order.
Reminders
  • Update mentors.
  • Consult other group members.
  • Do work according to the rubric.
  • Get everything done on time and keep constant with the calendar. It was developed for a reason.
  • Make sure final drawings are perfect-these are my grade for construction.

Friday, December 9, 2011

Log 8

ED
Log Date: December 9, 2011
Marking Period 2
Green Pier

Work Started
  • Topography lines-I started drawing the lines of the current elevations of the land now.  This will help me calculate the amount of fill I will need to complete construction on my part of the design. I have been speaking to my mentor about it because this is the first time I have ever done anything like this before.
Work Completed
  • Press Release-My press release is completely finished and printed. I am handing it in today.
Reminders
  • Continuously update mentors about project. Remember that we need 10 mentor contacts by the end of the marking period.
  • Check with group members about what they are doing too. We need to stay constant with what they are doing.
  • Complete drawings with as much detail as possible because these will count as our construction part of the project.  We are not constructing anything until the third marking period, when we make our final model of the finished site.
  • Keep constant with calendar. I made that at the beginning of the marking period to remain constant with what I am doing. I have done fairly well so far.
  • Abide by all rubrics to avoid bad grades.

Wednesday, December 7, 2011

Log 7

ED
Log Date: December 7, 2011
Marking Period 2
Green Pier

Work Started
  • Starting talking to my mentor about elevation lines for the final drawing
  • Spoke with other group members about final solution diagram
Work Completed
  • Press Release-Finished assignment to announce to the public about our presentations on January 17th.
  • Site map drawing-Added promenade to the final site map.
Reminders
  • Ask mentors for help and always check everything with group members
  • Do all work by the rubrics
  • Remember important due dates

Friday, December 2, 2011

Log 6

ED
Log Date: December 2, 2011
Marking Period 2
Green Pier

Work Completed
  • Re-finished all drawings-they get erased on the computer. I had extra copies on my flash drive but they weren't as up to date as the ones saved on the computer.
Reminders
  • Back up everything on a flash drive.
  • Update mentors and group members.
  • Follow rubrics.