Log Date: December 13, 2011
Marking Period 2
Green Pier
Work Started
- Topography Lines-Drawing the existing elevation lines on my 3D drawing. This will help me calculate the volume of fill I will need to order.
- Update mentors.
- Consult other group members.
- Do work according to the rubric.
- Get everything done on time and keep constant with the calendar. It was developed for a reason.
- Make sure final drawings are perfect-these are my grade for construction.